53-55 Faroe Road

Talina installed temporary works to hold up the front and two party walls. The remaining building was demolished and the remaining walls were underpinned 3m deep with two sided underpins at the front elevation. A basement was then excavated with new drainage installed, a new basement slab and RC walls around the perimeter of the property.